Generally the project can be divided into three principal areas.
Optimisation
of early warning systems on a regional scale, where landslide prone
areas are detected and classified.
On local
scale active zones are detected and observation methods and
devices are optimised for the specific case.
Issues related
with the transfer of information about possible hazards to the affected
population. The aim of this information transfer is an increased awareness
of the impending hazards and effective alerting in the case of a catastrophic
event.
At the beginning of the project proper study objects have to be selected.
Additionally a database concept has to be designed that helps to manage
all acquired data. It is planned to set up a central data server on which
all relevant data will be accessible for the participants of the project.
This server will also offer a number off www-Services that will help to
support information exchange between the participants.
For the work on the regional scale the first three quarters of 2002 will
serve for the acquisition of necessary data. The system for detection
and classification of landslides will partly be based on statistical analyses
of historical landslides which should take place within the second half
of 2002 and the first half of 2003. The realisation of the regional landslide
detection system will started in the 3rd quarter of 2002 and will be performed
by a multidisciplinary group.
On the local scale the first 3 quarters of 2002 are dedicated to the design
of observation networks. From the 2nd quarter 2002 on the systems will
be acquired and installed. It is absolutely crucial for the progress of
the project that the systems will operate at the earliest moment in order
to ensure a maximum period for observations that will allow comprehensive
data analysis and optimisation of the measurement devices. This work is
a core activity of the project and will last till the end of the project.
Concerning the information transfer to the population the year 2002 is
dedicated to the design of information systems and LBS. In 2003 and the
first half of 2004 it is planned to setup the systems in the test areas.
This process will be accompanied by a quality checking mechanism that
will investigate the functioning of the systems and the acceptance by
the population.
|

Draft of the vertical structure of the research project
For detailed information on the workpackages click
here.
|