|
The Reichenbach bridge is a 1,000 m long composite bridge erected
for the new BAB 71 from Erfurt to Schweinfurt in Thüringen.
The total width of the roadway between the railings is 28.5 m and
contains 2 + 1 lanes in both directions. The 14 spans of the bridge
vary between min. 40 m and max. 105 m.
Services: Construction Design for Sub- and Superstructure incl.
all Construction Stages
|