|
The bridge consists of an asymmetric cable layout with 4x 2 cables
on each side of the pylon. The asymmetric span lengths are 170 +
90 = 260 meter. The composite cross-section of the bridge has a
width of 14.70 meter. The deck is erected by the incremental launching
method.
Services: Detail Design, Wind Tunnel Tests, Dynamic Assessment
|