The Beska Bridge crosses the Danube between Novi Sad and Belgrade, it is the crossing of Corridor 10 (E-75) with Corridor 7 (Danube river) and therefore represents a key project in the European Infrastructure Network. Therefore the new Beska Bridge (three lanes) is to be built next to the existing Beska Bridge. The bridge has an overall length of 2205 m. The main bridge will be constructed in the free cantilever method and the approach bridges will be built using a movable scaffolding system. The highest piers are approximately 50 m.
Services: Check engineer