Structural Health MonitoringLife-Cycle Analysis and Maintenance Optimization Network Arch Bridge TW 5.1 A comprehensive life-cycle cost analysis was conducted by means of comparing the current bridge object – a double-track network arch bridge – with alternative construction types – having the same span length. Client: ÖBB Infrastruktur